What happens from your first inquiry to switching your system on.
The same engineer-led process we use on every project.
Tell us about your building and electricity bill. Our engineer visits site to assess roof condition, orientation and shading.
We size the system, calculate strings and cabling, and provide a written quotation for your approval.
A licensed engineer stamps the design drawings, and we prepare and submit the PEA / MEA interconnection application on your behalf.
Panels, inverter, mounting, cabling and protection are installed and tested on site by our team.
The utility inspects the installation and approves the meter change — your system is now switched on and producing power.
The exact list depends on your building type and the utility handling your area — we confirm the full list with you during the site assessment.
Processing time for permit approval depends on the utility (PEA or MEA) handling your area and current application volume — we keep you updated at each stage.
A printable, bilingual checklist covering every document — including account details and photos not listed above — so you can prepare everything before your site assessment.
Book a free site assessment and we'll walk you through every step, document by document.