Two decisions shape every solar project: which type of system fits how you use power, and how big it should be. Here is a plain-language way to make both choices.
Most people start by asking how many panels they need. It is better to start one step earlier: what should the system do for you? Cut the electricity bill, keep the lights on during a blackout, or run a site with no grid at all? The answer decides the system type, and the system type decides how you size it.
They differ mainly in whether they connect to the grid and whether they include batteries.
Panels feed a grid-tie inverter that runs in parallel with PEA or MEA power. Your building uses solar first and draws the rest from the grid. No batteries.
Best for: lowering the electricity bill where the grid is reliable. Usually the lowest cost per kWp and the simplest to maintain.
Watch out: standard grid-tie inverters shut down when the grid goes down (an anti-islanding safety rule), so there is no backup power in a blackout. Needs PEA or MEA approval.
Panels charge a battery bank through a charge controller and inverter. The site runs entirely on stored solar power, often with a generator as a last resort.
Best for: places the grid cannot reach, or where extending the grid costs more than a standalone system.
Watch out: it needs a large battery bank sized for nights and cloudy days. Batteries add major cost and wear out over the life of the system. It is rarely the right choice where grid power is available.
A grid-connected system with a hybrid inverter and battery added. Solar is used first, the battery second, the grid last, and chosen circuits can keep running during an outage.
Best for: sites with frequent outages or critical loads (cold storage, servers, security systems), or where you want to store daytime solar for the evening.
Watch out: it costs more than on-grid because of the battery and inverter. Backup covers selected circuits only, for a time limited by battery size. It still needs utility approval.
Find the line that sounds most like your situation.
Work through these five checks in order. The smallest limit wins.
This article is general guidance. The right system type and size depend on a site survey, your load profile, roof and utility requirements, and are confirmed in a written design. Figures are estimates based on the assumptions shown, not a quotation.
Tell us how you use power and what you want the system to do. We will recommend a type and size after a free site assessment.